Welcome to the SR 434 Corridor Planning Study website. The study limits are from the SR 417 interchange to Franklin Street, and from Smith Street to Mitchell Hammock Road. The section between Franklin Street and Smith Street is currently under construction and is being widened to four lanes. We refer to the section from SR 417 to Franklin Street as Section 1 and the section from Smith Street to Mitchell Hammock Road as Section 2.


The purpose of the Corridor Planning Study is to identify existing and future corridor needs, and to identify the most viable potential solutions to address those needs that can be carried forward to the Project Development and Environment Study, or PD&E Study, which will evaluate viable alternatives and select the preferred alternative.


The presentation from the Existing Conditions Public Meeting held on October 4, 2018 can be viewed at the following link: https://youtu.be/otj9imVqgdw


Please select the "Files" link above to access other project files and materials.